THE slip road on the A180 which has been closed since Tuesday has now reopened.
The eastbound exit onto the A160 at the Brocklesby Interchange was closed to allow essential resurfacing work to be carried out after the carriageway surface began to break up.
A Highways Agency spokeswoman confirmed that the road reopened at 10pm last night.
The eastbound exit onto the A160 at the Brocklesby Interchange was closed to allow essential resurfacing work to be carried out after the carriageway surface began to break up.
A Highways Agency spokeswoman confirmed that the road reopened at 10pm last night.